Results for "Smithsonian Institution. Latino Oversight Committee"

 
Showing results 205 - 210 of 210 for Smithsonian Institution. Latino Oversight Committee
  1. Henry Moves into East Wing; main Smithsonian Building Complete

    Henry Moves into East Wing; main Smithsonian Building Complete

    • Date: July 1855

  2.  
  3. Competition of 1846, Proposed SIB South Facade Elevation by Architect John Notman

    Competition of 1846, Proposed SIB South Facade Elevation by Architect John Notman

    • Date: 1846
    • Creator: Unknown
    • Creator: Unknown

  4.  
  5. William J. Rhees and Daniel Leech Outside the United States National Museum Under Construction

    William J. Rhees and Daniel Leech Outside the United States National Museum Under Construction

    • Date: 1880
    • Creator: Unknown
    • Creator: Unknown

  6.  
  7. Fireproofing of SIB Interior Begins, June 13, 1853, Smithsonian Archives - History Div.

    Fireproofing of SIB Interior Begins

    • Date: June 13, 1853

  8.  
  9. Competition of 1846, Proposed Basement & Conservatory Plan by Architect Owen G. Warren

    Competition of 1846, Proposed Basement & Conservatory Plan by Architect Owen G. Warren

    • Date: c. 1846
    • Creator: Unknown
    • Creator: Unknown

  10.  
  11. Competition of 1846, Proposed SIB Ground Floor Plan by Architect John Notman

    Competition of 1846, Proposed SIB Ground Floor Plan by Architect John Notman

    • Date: 1846
    • Creator: Unknown
    • Creator: Unknown

  12.  
Showing results 205 - 210 of 210 for Smithsonian Institution. Latino Oversight Committee

Pages