Construction Begins on NMAH Floor
Close
PrintConstruction begins on a 1-1/2 year project to repair the outer portions of the fourth-floor roof of the National Museum of American History, recaulk the pink Tennessee marble facade and replace some windows, including all the long, narrow windows in the exhibition areas. No exhibit areas are scheduled to close.
National Museum of American History (U.S.) (NMAH)
Chronology of Smithsonian History
Smithsonian Institution Archives, Record Unit 371, Box 5, "The Torch," September 1986, p. 2.
Institutional History Division, Smithsonian Institution Archives, 600 Maryland Avenue, S.W., Washington, D.C. 20024-2520, SIHistory@si.edu
1986